Concrete Jack Up Floating Floors – One Wilton Park – LinkedIn HQ Dublin
Mason UK designed, provided all acoustic materials, and supervised the installation on site of the floating floors undertaken by Structuretone’s concrete contractor. Our engineer undertook all QA tasks checking the installation at key stages.
The installation was a success taking only 3 days to prep and pour the floors and 1 day to jack the floors once the concrete had cured.
The jack up system again proved ideal, as the Raised Access Floor contractor on site the same time as Mason UK required the floors to be lowered slightly to match threshold levels.